Mining activities are carried out with prepatory construction, including infrastructure and mining safety facilities.
Haul Roads 14 metres wide and 23 KM long extending to the PT. Sentosa Mulia Bahagia Coal port in Sungai Lalan, Mangsang Village, Bayung Lencir, Sub-District, Musi Banyuasin Regency.
Loading Facilities equipped with a 500 tons per hour capacity belt conveyor are also provided
Jetty Dock for Barge to collect the product